A drawing of the exterior of a building.

PROJECT

Hirayama Elementary, Clovis Unified School District
Sq Ft: 90,879

Type: New Construction

Location: Clovis, CA

HVAC systems consisting of package gas/electric units used for all classroom and multi-purpose room spaces: 8 new buildings totaling 90,879 SF. Type I & II hoods for kitchen and dishwasher equipment, heat pump split systems for support/IT spaces, and variable refrigerant flow (VRF) systems for administration spaces. Plumbing design including sewer, water, gas and roof/overflow drains. All buildings are equipped with fire sprinkler system.